书单推荐
更多
新书推荐
更多

中国铁路总公司企业标准(Q/CR 9604-2015):高速铁路隧道工程施工技术规程(英文版)

中国铁路总公司企业标准(Q/CR 9604-2015):高速铁路隧道工程施工技术规程(英文版)

定  价:1150 元

        

  • 作者:中国铁路总公司 编
  • 出版时间:2016/4/1
  • ISBN:9787113215354
  • 出 版 社:中国铁道出版社
  • 中图法分类:U459.1-65 
  • 页码:164
  • 纸张:胶版纸
  • 版次:1
  • 开本:16开
9
7
2
8
1
7
5
1
3
1
5
3
4
  This technical specification is formulated with a view to guiding the construction of high-speed railway tunnel9uniforming major technical requirements, strengthening construction management, and ensuring construction quality.
  This technical specification is applicable to high-speed railway tunnel construction.
  The construction of high-speed railway tunnel shall strictly comply with national laws and regulations as well as relevant technical standards, conform to design documents, meet the requirements for safety, durability and system application function of engineering structures, and ensure normal operation during designed service life.
  All parties involved in the construction shall standardize the management system, manning, onsite management and process control, and achieve such construction management targets as quality, safety, construction period, investment benefit, environmental protection and technological innovation.
  Mechanized construction, member prefabrication in plant, specialized construction and information technology shall be irutiatively utilized in the construction of high-speed railway tunnel.
  During the construction of high-speed railway tunnel, great importance shall be attached to geological verification, geological prediction and monitoring and measurement, and strict control shall be made on the construction quality of key works such as advance support, primary support, foundation base treatment, waterproofing9 drainage and secondary lining.
  During the construction of high-speed railway tunnel, on-site management shall be strengthened, site layout shall be standardized, and HSE (Health, Safety and Environment) management shall be enhanced During the construction of high-speed railway tunnel, attentions shall be paid to the identification, evaluation, prevention, monitoring, emergency response and engineering treatment against geological disasters so as to minimize these disasters and their impacts.
  During the construction of high-speed railway tunnel, risk management shall be carried out according to specific conditions of the site by means of risk planning, risk identification, risk evaluation, risk assessment, risk control, etc. And special construction plans and emergency plans shall be developed
  Construction of high-speed railway tunnel shall be on the basis of the protection measures specified in the scheme and design approved by the cultural relic protection administrative department, if cultural relics protection units and other cultural relic sites are involved
  Construction of high-speed railway tunnel shall strictly comply with relevant national laws, regulations and technical standards on resource saving, energy saving and emission reduction, and the technical measures for energy saving and emission reduction shall be formulated and implemented, taking into account engineering characteristics and construction environment.
  For high-speed railway tunnel construction, construction emergency rescue organization shall be established and equipped with rescue facilities according to relevant regulations of China Railway Corporation
 你还可能感兴趣
 我要评论
您的姓名   验证码: 图片看不清?点击重新得到验证码
留言内容